Blog · November 16, 2026

First Baptist Church, Ringgold, LA Pew Upholstery Project

Savanna Williams-Bowlin · Uncategorized

Church Pews before Church Pew Upholstery in Louisiana

Case study at a glance

Church First Baptist Church
Location Ringgold, Louisiana
Scope On-site pew upholstery, moving from seat-only to seat and front-of-back
Fabric Watercolor: soft neutrals with enough texture to hold interest, chosen to work with the carpet, walls, and light
Foam High-density foam built into the new seat-and-back layout
Wood Joints checked. Pews stayed in the building.
Crew Our own Sharpe's crew, on site
Teal seat-only pews before upholstery at First Baptist Church, Ringgold, Louisiana
Before: dated teal, seat-only fabric

About First Baptist Church

First Baptist Church serves Ringgold, a small community in Bienville Parish in northwestern Louisiana. The church asked Sharpe's to reupholster pews that had been covered only on the seats, and to add cushioning on the fronts of the backs as well.

The challenge

In the before photo, the pews have a dated teal fabric on the seats only, with bare wood on the backs, so the rows look split. The sanctuary has brick walls, stained-glass windows, and a warm wood grain on the pew frames. Leadership wanted a calmer fabric that worked with the carpet, walls, and light, and a finished seat-and-back layout that would be more comfortable to sit in.

Planning the project

Sharpe's Church Interiors is Disabled Veteran-owned and BBB A+ accredited. Our crews travel from Dunn, North Carolina, to churches in all 48 contiguous states, and all work is done on-site at the church — the pews do not leave for a shop visit.

The work begins with photos of the existing pews. Fabric samples are sent with the quote, and the committee picks. First Baptist went through samples and landed on Watercolor, a fabric with soft neutrals and enough texture to hold interest, chosen to work with the carpet, walls, and light. Sharpe's works with commercial olefin or nylon, including four-way stretch commercial fabric. Typical lead time is 3-5 months from signed contract to completed project, depending on fabric availability. On-site work typically takes 3 days to 2 weeks and is scheduled between Sundays so the church does not miss a Sunday.

What our crew did

The crew checked the joints, then built high-density foam and fabric into a seat and front-of-back layout, pew by pew. The pews stayed in the building. Work moved section by section so Sundays stayed available. A mobile press we built ourselves, modeled on the factory press, is used to give that tailored, new-pew look, with factory-to-field style fastening. A video from the project is included on this page.

The result

The rows look finished, and people sit on cushioned seats and backs in a fabric that fits the sanctuary. The congregation kept the wood frames it already had. Reupholstering costs about one-third of new pews of similar quality. The pew work is backed by our Lifetime Workmanship Warranty.

Is your church considering the same?

If your church is looking at worn or unpadded pews, you do not have to start over. Reupholstering costs about one-third of new pews of similar quality, and our crews do the work on-site at your church. Learn more about pew upholstery, compare packages, see more of our work, or request a quote.

Plan a project like this

How church pew upholstery works · Packages · See more of our work

Ready for your sanctuary

We’ll start you with Masterpiece.

Same crews you read about here.

(910) 694-3007

Committee quote

Start with Masterpiece.

Restore and Core are available. Most churches still choose Masterpiece so they only mobilize a crew once.

Package
Also in scope

We call within one business day. Or ring us now at (910) 694-3007.